3 August 2023
Biovic, the engineering firm behind the major biomethane projects in Spain
Spain aims to reach a biomethane production of 1.200 billion cubic meters by 2030. This clean, renewable gas will significantly contribute way the transition from the current energy model to a more sustainable and decarbonized one. Biovic, a leading Spanish company in the engineering and execution of sustainable energy projects, which is behind the conceptualisation and design of the main biomethane plants broughtainto operation in recent months in the country.
Specifically, these projects are located in Catalonia, the Valencian Community, Murcia, Castile and León, Andalusia and Castilla–La Mancha, regions with great opportunities for development in the biomethane industry. “At Biovic we have been pioneers in developing this type of engineering project, because we are convinced of the extraordinary growth potential, as well as the strategic importance of this clean energy in achieving a much more sustainable and autonomous energy model, in line with European guidelines”,, says Luis Puchades, Biovic director.
In this way, this energy uses various types of waste from the agri-food industry to generate renewable gas, which, subsequently, can be injected directly into the grid for the same uses as natural gas, with a similar methane content. This clean fuel has a negative carbon footprint and can be used both industrially and for decarbonising maritime, heavy-duty and urban transport.
Energy projects yes, but fundamentally agri-environmental projects
Biovic provides services to clients with very diverse project motivations. From the implementation of upgrading (modernisation) systems in water treatment plants or agro-industrial plants; to waste recovery projects or renewable gas plant development projects. It is also one of the leading biogas consultancies in Spain, a sector in which it has carried out numerous studies on the potential to generate this energy, regulatory development, due diligence of investment projects, and basic and detailed engineering.
During 2023 the company is commissioning two biomethane facilities. In particular, The the Galivi project, in Lorca (Murcia), will inject into the gas grid up to 30 GWh of biomethane a year, produced at the Galivi Solar waste plant in this town, which will also mean savings in emissions of around 7,820 tonnes of CO2 equivalent (t-eq CO2). For its part, the Granollers plant, promoted by the Bioenergía Vallés Oriental (BioVO) project, will produce annually 22 GWh of biomethane. Its aim is to drive the decarbonisation of the economy in Catalonia through the production of this renewable gas from treatment processes at the Anaerobic Digestion and Composting Plant of the Consorci per a la Gestió dels Residus del Vallès Oriental and at the Wastewater Treatment Plant (WWTP).
Another example of Biovic's engineering can be found at the Montes de Toledo Biomethane. Eis a project located in the municipality of Noez (Toledo), carried out by the joint venture Biomethane Initiatives, formed by Sitra and Suma Capital, which will produce 40 gigawatt hours of biomethane a year, as well as compost, and is expected to come into operation in 2024. The initiative will become the main source of biomethane and fertiliser production in the region, thus advancing the vision of promoting sustainability and the development of renewable energies.
With regard to biogas projects, noteworthy is the Llutxent plant (València), belonging to the Montagut group. At these facilities up to 129,000 tonnes of waste will be treated, including brines, leachates, organic waste, both for anaerobic digestion and directly for composting, as well as plant and wood waste.
One project in which Biovic has been involved for more than 10 years is in the company that promotes the Vall d´Uixó biogas plant, AEMA Servicios Energéticos, which has just announced a project in Utiel that will use agro-industrial waste to produce close to 20 MWh of biomethane. This plant is aligned with the Valencian Biogas Route, which promotes the construction of a hundred renewable gas plants in the region to produce 65 % of the gas consumed by Valencian households.
“Biomethane is undoubtedly an energy that links directly to the circular economy model to which the European Union is committed, and Biovic is an engineering firm that takes a holistic and comprehensive view of projects of this type”, adds Luis Puchades.
In this respect, the consultancy has taken part in the Study on Biomethane Production Capacity in Spain, the only report to date that analyses the potential for biomethane production in Spain and defines specific measures to drive its development in the different autonomous communities. Biovic developed this study together with Sedigás and PriceWaterhouse Cooper.
Related news
Need help?
We are here for whatever you need